
Find a new launch.
Find your place.
Explore neighbourhoods, compare projects
and discover a home that fits your life.
All districts
All market segments
Any bedrooms
Any year
Explore new launch condos 8
Explore confirmed projects and current-year completions
How Featured is selected
Loading ranking signals…
Our discovery score gives up to 50 points for URA new-sale activity in the last three complete months, 35 for proximity to a mapped MRT station, and 15 for development size. These are browsing signals, not a forecast of demand or returns. Known sold-out projects and projects with actual TOP in the last six months are excluded. Uncertain completion dates are held out where they could fall within that period. Availability must be reconfirmed; choose All projects to browse the full catalogue.
Indicative source-listed prices. Source dates vary by project. Figures may reflect earlier launch pricing; availability and prices require reconfirmation. Coverage includes reviewed URA pipeline projects and verified current-year completions. Further completions and newly announced developments are under review.
Explore by location
Ang Mo Kio
Lentor Central (upcoming)
A confirmed future residential development at Lentor Central, awarded on 6 March 2026. GuocoLand’s 2 July 2026 update outlines approximately 553 homes in three towers: two of 26 storeys and one of 27 storeys. The developer targets a launch in the first half of 2027; this is a stated target, not a confirmed opening date or TOP forecast.
Project details
- Location
- Lentor Central
- Tenure
- 99-year leasehold
- Developer
- GuocoLand (Singapore) Pte. Ltd., Intrepid Investments Pte. Ltd. and TID Residential Pte. Ltd.
- Residences
- About 553 homes planned · final scheme pending
- Completion
- Expected TOP 2031
- Launch status
- Developer target: first half of 2027 · subject to change
URA SPACE forecasts TOP in 2031 for Lentor Central, checked 14 September 2026. This is a government forecast, not an issued TOP or developer guarantee. The developer’s detailed completion and vacant-possession timetable remains to be announced.
Lentor Central (upcoming) indicative PSF
No eligible recorded transaction average is available in the saved data. Pricing is on request.
Location & transport
The site is beside Lentor Modern and its retail mall, which connects to Lentor MRT on the Thomson–East Coast Line. That connection belongs to neighbouring Lentor Modern; a direct connection from this upcoming project is not confirmed. No measured walking distance is provided.
Current prices & viewing
Pricing on request. Confirm current prices, unit availability and viewing arrangements with us. Recorded transactions are historical and do not confirm which units are available today.
Explore Lentor Central (upcoming) →Sources & information status
Project record checked: 14 September 2026. Dates and availability may change.
Developer planned tower configuration, approximate count and target launch period reviewed. Marketing name, approved layouts and prices remain pending.
SINGAPORE REAL ESTATE
New condo launches in Singapore
Explore launch guides, project details, floor plans and indicative transaction PSF.
Launch year is when sales begin; TOP is a separate completion milestone.
A clearer picture.
A confident next step.
Get floor plans, the latest pricing and availability, or arrange a showflat visit. Tell us what matters to you.