D17 · Pasir Ris · Jalan Loyang Besar
Coastal Cabana
A 748-home executive condominium at Jalan Loyang Besar, with three- to five-bedroom layouts. The brochure sets out landscaped gardens, two 50-metre pools, a clubhouse and rooftop gathering spaces near Pasir Ris Park and Downtown East.

Project details
- Location
- Jalan Loyang Besar
- District / segment
- D17 · OCR
- Tenure
- 99-year
- Developer
- Pasir Ris Development Pte. Ltd.
- Residences
- 748
- Completion
- TOP to be confirmed
- MRT
- Pasir Ris
- Launch status
- Launched
- Developer sales
- Marketed by Qingjian; current unit availability on request
The reviewed brochure gives vacant possession as 31 March 2029 and legal completion as 31 March 2032; neither is a TOP date. An earlier URA pipeline forecast of 2028 is retained in the research register. A current developer TOP confirmation is still needed.
Residence types & layouts
| Residence | Recorded size (sq ft) |
|---|---|
| 3 bedrooms deluxe · C1a | 872 |
| 3 bedrooms deluxe · C1b | 872 |
| 3 bedrooms premium · C2 | 915 |
| 3 bedrooms premium + study · C3 | 915 |
| 4 bedrooms classic · D1 | 990 |
| 4 bedrooms deluxe · D2 | 1012 |
| 4 bedrooms premium · D3 | 1055 |
| 4 bedrooms premium + study · D4 | 1163 |
| 4 bedrooms premium + study · D4-B | 1216 |
| 4 bedrooms premium + flexi · D5 | 1206 |
| 5 bedrooms premium · E1 | 1367 |
| 5 bedrooms premium · E2 | 1421 |
Twelve published plan families include ground-floor private enclosed space (PES) versions where shown. Original sheets preserve mirrored-unit lists, block and floor restrictions, key plans and dividing-wall annotations. D4 and D4-B are separate layouts. Areas include balcony or PES and exclude AC and RC ledges; dimensions are approximate and subject to final survey. Both the fridge and washer are excluded in the plan legends.
Prices & viewing
Pricing on request. The interactive project page includes available floor plans and indicative average transacted PSF, based on recent recorded sales across all bedrooms. Confirm current prices, unit availability and viewing arrangements with us.
Explore Coastal Cabana →Sources & information status
Project record checked: 19 September 2026. Dates and availability may change.
Brochure reviewed: 12 complete plan families, 13 gallery images, site/location/distribution diagrams and balcony annex. URA transactions connected. Current TOP confirmation, contract specifications, later amendments, current prices and availability remain to verify.