D27 · Canberra · Sembawang
Canberra Crescent Residences
376 one- to four-bedroom homes across four 12-storey blocks at Canberra Crescent. Developed by Peak Crescent, a joint venture of Kheng Leong and Low Keng Huat, with architecture by P&T Group, landscape design by Salad Dressing and interiors by Index Design.

Project details
- Location
- 51, 53, 55 & 57 Canberra Crescent
- District / segment
- D27 · OCR
- Tenure
- 99-year leasehold
- Developer
- Peak Crescent Pte Ltd · Kheng Leong & Low Keng Huat
- Residences
- 376
- Completion
- Expected TOP 2029
- MRT
- Canberra
URA SPACE lists an expected TOP in 2029 for the Canberra Crescent site, checked 14 September 2026. This is a government forecast, not an issued TOP or developer guarantee. The contractual vacant-possession date of 30 April 2030 and legal completion date of 30 April 2033 are separate milestones.
Facilities & surroundings
A 100m Sky Garden connects blocks 55 and 57, alongside ground-level pools, gardens and Canberra Club.
Residence types & layouts
| Residence | Recorded size (sq ft) |
|---|---|
| 1-Bedroom (3 homes) | 409 |
| 2-Bedroom Compact (23 homes) | 570 |
| 2-Bedroom Premium (68 homes) | 667 |
| 3-Bedroom Compact (141 homes) | 797–883 |
| 3-Bedroom Premium (57 homes) | 990 |
| 4-Bedroom Compact (36 homes) | 1163–1173 |
| 4-Bedroom Standard (36 homes) | 1216 |
| 4-Bedroom Premium (12 homes) | 1324 |
Original 376-home distribution, not remaining availability. Sixteen individual plan sheets cover 15 type labels, including PES and stack-specific variants. The separate plan set supplied on 26 June 2025 corrects the 2BR-Pa Block 55 range to #02-20–#12-20. The 3BR-Sb screening annotation still needs developer clarification. Areas include balconies/PES where applicable and exclude AC and non-load-bearing RC ledges; subject to final survey.
Prices & viewing
Pricing on request. The interactive project page includes available floor plans and indicative average transacted PSF, based on recent recorded sales across all bedrooms. Confirm current prices, unit availability and viewing arrangements with us.
Explore Canberra Crescent Residences →Sources & information status
Project record checked: 14 September 2026. Dates and availability may change.