D24 · Tengah · Plantation Close
Otto Place
An executive condominium in Tengah’s Plantation District by Hoi Hup and Sunway. Otto Place has 600 homes across eight blocks and offers three- and four-bedroom layouts with study options.

Project details
- Location
- Plantation Close
- District / segment
- D24
- Tenure
- 99-year
- Developer
- Hoi Hup Sunway Plantation Pte Ltd
- Residences
- 600
- Completion
- Expected TOP 2028
- MRT
- Bukit Batok West / Tengah Park (future)
Hoi Hup’s project construction update, checked 19 September 2026, estimates TOP in Q1 2028, subject to change. This is a forecast, not an issued TOP. The developer separately states notice of vacant possession on 30 June 2030 and notice of completion on 30 June 2033.
Residence types & layouts
| Residence | Recorded size (sq ft) |
|---|---|
| 3 bedrooms Deluxe · C1 | 872 |
| 3 bedrooms Deluxe + Study · C2 | 904 |
| 3 bedrooms Deluxe + Study · C3 | 936 |
| 3 bedrooms Luxury + Study · C4 | 947 |
| 3 bedrooms Luxury + Study · C5 | 958 |
| 4 bedrooms Deluxe + Study · D1 | 1012 |
| 4 bedrooms Luxury + Study · D2 | 1195 |
Seven published layout families include their -G ground-floor variants with private enclosed space (PES). Quoted areas include the balcony or PES; RC ledges, air-conditioner ledges and marked voids are non-strata. The full sheets retain mirrored-unit references and the D1 Block 24 variation. Areas are approximate and subject to final survey and approved amendments. Original layouts do not establish current availability.
Prices & viewing
Pricing on request. The interactive project page includes available floor plans and indicative average transacted PSF, based on recent recorded sales across all bedrooms. Confirm current prices, unit availability and viewing arrangements with us.
Explore Otto Place →Sources & information status
Project record checked: 19 September 2026. Dates and availability may change.
Official brochure and seven published plan families reviewed; gallery, site plan, unit distribution and marketing features available. Current pricing/availability, full contractual specifications and later amendments remain to verify. Recorded sales are available in the sales-transactions section.
- Hoi Hup · project and construction update · checked 19 September 2026
- Hoi Hup · launch particulars · 2 July 2025
- Official developer-linked brochure · reviewed 19 September 2026
- Published balcony-screen drawing and installation conditions
- SLA OneMap · development address and map point · checked 20 September 2026