D21 · Jalan Jurong Kechil
The Sen
A 347-home condominium in five 10-storey blocks in Upper Bukit Timah. Classic and Prestige collections offer one to four bedrooms, including study layouts, around landscaped pools, a clubhouse and roof gardens.

Project details
- Location
- 222, 224, 226, 228 and 230 Jalan Jurong Kechil
- District / segment
- D21 · RCR
- Tenure
- 99-year
- Developer
- SL Capital (8) Pte Ltd · Sustained Land, H10 Holdings and Great View Development
- Residences
- 347
- Completion
- Expected TOP 2029
- MRT
- Beauty World / Hume
URA SPACE forecasts TOP in 2029 for De Souza Avenue, checked 14 September 2026. This is a government forecast, not an issued TOP or developer guarantee. The developer’s expected vacant possession on 31 August 2030 and legal completion on 31 August 2033 are separate contractual milestones.
Facilities & surroundings
347 homes · 50m lap pool · Roof gardens
Residence types & layouts
| Residence | Recorded size (sq ft) |
|---|---|
| 1 bedroom · A1 · 10 homes | 452 |
| 2 bedrooms · B1 · 50 homes | 678 |
| 2 bedrooms · B2 · 30 homes | 678 |
| 2 bedrooms · B3 · 30 homes | 732 |
| 2 bedrooms + study · B4 · 30 homes | 764 |
| 2 bedrooms + study · B4A · 27 homes | 775 |
| 3 bedrooms · C1 · 30 homes | 872 |
| 3 bedrooms · C2 · 30 homes | 936 |
| 3 bedrooms · C3 · 30 homes | 1109 |
| 3 bedrooms + study · C4 · 40 homes | 1259 |
| 4 bedrooms + study · D1 · 20 homes | 1453 |
| 4 bedrooms + study · D1A · 20 homes | 1453 |
The 12 plan families cover the original 347-home distribution, not current availability. Full sheets retain ground-floor, upper-floor and facade variations. Areas include balcony or private enclosed space (PES) where applicable, while AC ledges, RC ledges and non-strata void are excluded. Confirm the latest plan for the specific unit before purchase.
Prices & viewing
Pricing on request. The interactive project page includes available floor plans and indicative average transacted PSF, based on recent recorded sales across all bedrooms. Confirm current prices, unit availability and viewing arrangements with us.
Explore The Sen →Sources & information status
Project record checked: 14 September 2026. Dates and availability may change.
Developer brochure, 12 plan families, 13 gallery images, site plan and unit distribution reviewed; full contractual specifications and current prices/availability requested.