D05 · Slim Barracks Rise · one-north
Blossoms by the Park
An EL Development project with 275 residences in a 27-storey tower beside one-north Park. Homes range from 1 bedroom + study to 4-bedroom Premium layouts, including 3-bedroom dual-key homes and top-floor variants. Resident facilities include a 50m lap pool, wellness pool, gymnasium and spaces for gatherings, with commercial premises on the lower levels.

Project details
- Location
- 9 Slim Barracks Rise, Singapore 139742
- District / segment
- D05 · RCR
- Tenure
- 99-year leasehold
- Developer
- EL Development (Buona Vista) Pte Ltd/EL Development (One-North) Pte Ltd
- Residences
- 275
- Completion
- Expected TOP 2026
URA SPACE forecasts TOP in 2026 for Slim Barracks Rise (Parcel A), checked 14 September 2026. This is a government forecast, not an issued TOP or developer guarantee. The developer’s corporate website lists completion in 2027, and its brochure gives expected vacant possession on 31 December 2027. These differ from the government TOP forecast; confirm current timing with the developer. The 99-year lease began on 10 January 2022.
Residence types & layouts
| Residence | Recorded size (sq ft) |
|---|---|
| 1 bedroom + study | 549–689 |
| 2 bedrooms | 678–829 |
| 2 bedrooms + study | 721–872 |
| 3 bedrooms | 1044–1259 |
| 3 bedrooms dual key | 915–1033 |
| 4 bedrooms | 1302–1539 |
| 4 bedrooms Premium | 1507–1884 |
The larger sizes shown include top-floor variants with strata void over high-ceiling areas. Brochure areas also include balconies and air-conditioner ledges; they are not all internal usable floor area. Compare the individual plans and void-area breakdowns. Areas are subject to final survey; current availability is on request.
Prices & viewing
Pricing on request. The interactive project page includes available floor plans and indicative average transacted PSF, based on recent recorded sales across all bedrooms. Confirm current prices, unit availability and viewing arrangements with us.
Explore Blossoms by the Park →Sources & information status
Project record checked: 14 September 2026. Dates and availability may change.
Confirmed project; further developer materials being reviewed