D18 · Tampines West · Tampines Street 95
Rivelle Tampines
An executive condominium by Sim Lian with 572 homes across eleven blocks in Tampines West. Its three- to five-bedroom homes sit around landscaped pools and a three-storey clubhouse. The developer’s website carries a sold-out report; the published plans describe original layouts and do not establish current availability.

Project details
- Location
- 51–71 Tampines Street 95
- District / segment
- D18 · OCR
- Tenure
- 99-year
- Developer
- Sim Lian JV (Tampines 7) Pte Ltd
- Residences
- 572
- Completion
- TOP to be confirmed
- MRT
- Tampines West
- Launch status
- Launched March 2026
- Developer sales
- Developer website reports sold out; reconfirm any returned units
The official brochure states vacant possession on 30 June 2030 and legal completion on 30 June 2033. A TOP forecast has not been confirmed by the developer. These are separate milestones; an updated TOP announcement is awaited.
Residence types & layouts
| Residence | Recorded size (sq ft) |
|---|---|
| 3 bedrooms premium · C1P | 883 |
| 3 bedrooms premium + study · C2S | 926 |
| 4 bedrooms · D1 | 1044 |
| 4 bedrooms · D1a | 1044 |
| 4 bedrooms + study · D2S | 1109 |
| 4 bedrooms flexi · D3F | 1184 |
| 4 bedrooms premium · D4P | 1184 |
| 5 bedrooms · E1 | 1378 |
Eight published variants include the D1a layout and ground-floor (p) versions with private enclosed space (PES). The sheets retain mirrored-unit lists, block/floor-specific dividing walls, key plans and legends. Areas include balcony or PES; RC and AC ledges are non-strata. Areas are approximate and subject to final survey and approved changes. The fridge is excluded and the washer-dryer is included, as stated in the original legends.
Prices & viewing
Pricing on request. The interactive project page includes available floor plans and indicative average transacted PSF, based on recent recorded sales across all bedrooms. Confirm current prices, unit availability and viewing arrangements with us.
Explore Rivelle Tampines →Sources & information status
Project record checked: 19 September 2026. Dates and availability may change.
Official brochure and all eight published plan variants reviewed. Ten gallery images, site/location diagrams and original unit distribution available. TOP forecast, full contract specifications, later amendments and any returned-unit availability remain to verify. Recorded sales are available in the sales-transactions section.
- Sim Lian · project particulars and media updates · checked 19 September 2026
- Sim Lian · Rivelle_5-Bedroom.pdf
- Sim Lian · Rivelle-Brochure.pdf
- Sim Lian · Rivelle_3-Bedroom.pdf
- Sim Lian · Rivelle_4-Bedroom.pdf
- Sim Lian · eligibility booklet and March2026 launch procedures
- Developer balcony-screen annex and statutory particulars
- SLA OneMap · development address and map point · checked 20 September 2026