D26 · Lentor Central
Lentor Central Residences
99-year · 477 residences
477 homes in two towers at Lentor Central, with one- to four-bedroom layouts, landscaped pools, a clubhouse and elevated sky terraces.
Expected TOP 2027
View project →
Explore neighbourhoods, compare projects
and discover a home that fits your life.
Explore confirmed projects and current-year completions
Loading ranking signals…
Our discovery score gives up to 50 points for URA new-sale activity in the last three complete months, 35 for proximity to a mapped MRT station, and 15 for development size. These are browsing signals, not a forecast of demand or returns. Known sold-out projects and projects with actual TOP in the last six months are excluded. Uncertain completion dates are held out where they could fall within that period. Availability must be reconfirmed; choose All projects to browse the full catalogue.
Indicative source-listed prices. Source dates vary by project. Figures may reflect earlier launch pricing; availability and prices require reconfirmation. Coverage includes reviewed URA pipeline projects and verified current-year completions. Further completions and newly announced developments are under review.
D26 · Lentor Central
Hillock Green comprises 474 homes across three 23-storey towers at Lentor Central. Explore the original residence types, ground-level facilities and Level 14 sky terraces below.

URA quarterly pipeline, checked 12 September 2026. Forecasts may change. Developer’s earlier estimated completion: Q3 2027. Latest TOP confirmation requested.
$2,055 psf
Indicative average of 7 recorded sales · 2026-06 to 2026-09. All bedroom types.
URA data saved 18 Nov 2026. Data is checked daily; this is a historical transaction average, not an asking price or valuation.
The sample includes the latest five eligible sales, plus all sales in the fifth sale’s month. Fewer sales are used when fewer are available. Sources & PSF methodology
| Residence | Recorded size (sq ft) |
|---|---|
| 1 bedroom · A1 · 22 homes | 517–689 |
| 2 bedroom classic · B1C · 44 homes | 624–775 |
| 2 bedroom classic · B2C · 22 homes | 657–818 |
| 2 bedroom · B3 · 22 homes | 710–883 |
| 2 bedroom · B4 · 44 homes | 710–872 |
| 2 bedroom + study · B5S · 20 homes | 753–904 |
| 2 bedroom + study · B6S · 41 homes | 786–958 |
| 3 bedroom · C1 · 22 homes | 904–1087 |
| 3 bedroom · C2 · 22 homes | 936–1130 |
| 3 bedroom · C3 · 22 homes | 947–1141 |
| 3 bedroom + study · C4S · 22 homes | 1023–1227 |
| 3 bedroom + study · C5S · 22 homes | 1033–1238 |
| 3 bedroom + study · C6S · 22 homes | 1055–1259 |
| 3 bedroom + study · C7S · 22 homes | 1066–1270 |
| 3 bedroom premium · C8P · 21 homes | 1184–1442 |
| 4 bedroom classic · D1C · 22 homes | 1184–1432 |
| 4 bedroom premium · D2P · 20 homes | 1313–1572 |
| 4 bedroom premium · D3P · 20 homes | 1324–1582 |
| 4 bedroom premium · D4P · 22 homes | 1335–1572 |
The original distribution accounts for all 474 homes across 19 plan families. Counts describe the original scheme, not current availability. Stated areas include AC ledges, balconies, private enclosed spaces and strata voids where applicable. Larger (L) variants include voids above the living/dining area: the extra strata area is not additional usable floor space. Check the complete drawing for the selected type, floor and stack.
At Lentor Central in District 26. The developer’s site plan shows a covered linkway and Lentor MRT across the road. The map pin is the approximate URA site centroid, not a residential entrance; no walking distance is inferred from it.
Open the available plan sheets below. Refer to printed dimensions and the developer’s final contractual documents; original unit counts do not establish current availability.
The brochure describes a smart gateway, digital lock, smart lighting and smart air-conditioning. The digital lock supports app access, fingerprint, PIN and card. Confirm the exact equipment and room coverage in the selected unit’s current contractual specification.
The plan sheets distinguish standard, ground-floor (G) and larger (L) variations. Where marked, strata voids above living/dining spaces are included in the stated areas. These voids are not additional usable floor space. PES, balconies and AC ledges also vary by unit.
The brochure includes the approved screen design. Screen installation is at the purchaser’s expense and subject to the stated design and installation requirements.
Illustrated furniture and decorative items do not establish supplied fittings. The full contractual specifications and current unit-specific information are available on request.
Pricing on request. Confirm current prices, unit availability and viewing arrangements with us. Recorded transactions are historical and do not confirm which units are available today.
Explore Hillock Green →Project record checked: 13 September 2026. Dates and availability may change.
19 complete plan families and 52 area variants reviewed; 474-home distribution, ground and sky site plans, smart-home overview and four official gallery images. Current actual TOP notice, full contractual specifications and current prices/availability outstanding.
D26 · Lentor Central
99-year · 477 residences
477 homes in two towers at Lentor Central, with one- to four-bedroom layouts, landscaped pools, a clubhouse and elevated sky terraces.
Expected TOP 2027
View project →D26 · Lentor Gardens
99-year leasehold · 499 residences · Lentor MRT
Lentor Gardens Residences comprises 496 apartments and three five-bedroom strata terraces. Three 16-storey blocks and one eight-storey block are arranged around extensive pools and landscaped facilities, with shops and an early childhood development centre within the development.
Expected TOP 2030
View project →D26 · Lentor Hills Road
99-year leasehold · 598 residences
598 leasehold homes on Lentor Hills Road. Landscaped grounds, elevated gardens and connected sky terraces create spaces for exercise, working and gathering.
Est. completion 2026
Launched July 2023 · current resale and subsale options on request
D26 · Lentor Gardens
99-year leasehold · 533 residences · Lentor MRT
A 533-home development in Lentor Gardens with a black-and-white bungalow-inspired clubhouse, a 50m pool and landscaped forest gardens. The original mix ranges from two to five bedrooms, including ground-floor PES variants. GuocoLand reported completion in the third quarter of 2026 and all original units sold as at 30 June 2026.
TOP 2026
View project →SINGAPORE REAL ESTATE
Explore launch guides, project details, floor plans and indicative transaction PSF.
Launch year is when sales begin; TOP is a separate completion milestone.
Get floor plans, the latest pricing and availability, or arrange a showflat visit. Tell us what matters to you.