Lentor Central Residences
477 homes in two towers at Lentor Central, with one- to four-bedroom layouts, landscaped pools, a clubhouse and elevated sky terraces.

Project details
- Location
- 18 & 20 Lentor Central
- District / segment
- D26 · OCR
- Tenure
- 99-year
- Developer
- Lentor Central Park Pte. Ltd.; Hong Leong Holdings, GuocoLand and CSC Land Group joint venture
- Residences
- 477
- Completion
- Expected TOP 2027
URA quarterly pipeline, checked 12 September 2026. Forecasts may change. Developer’s earlier forecast: Q4 2028. Latest TOP confirmation requested.
Facilities & surroundings
One to four bedrooms · clubhouse · 14th-storey sky terraces
Residence types & layouts
| Residence | Recorded size (sq ft) |
|---|---|
| 1 bedroom · (1)a1 | 463 |
| 1 bedroom · (1)a | 463 |
| 1 bedroom · (1)b1 | 463 |
| 1 bedroom · (1)b | 463 |
| 1 bedroom · (1)c1 | 581 |
| 2 bedrooms · (2)a1 | 678 |
| 2 bedrooms · (2)a | 678 |
| 2 bedrooms · (2)b1 | 689 |
| 2 bedrooms · (2)b | 689 |
| 2 bedrooms · (2)c1 | 678 |
| 2 bedrooms · (2)c | 678 |
| 2 bedrooms · (2)d | 786 |
| 2 bedrooms · (2)e1 | 786 |
| 2 bedrooms · (2)e | 786 |
| 2 bedrooms · (2)f1 | 797 |
| 2 bedrooms · (2)f | 797 |
| 2 bedrooms · (2)g | 786 |
| 3 bedrooms · (3)a1 | 915 |
| 3 bedrooms · (3)a | 915 |
| 3 bedrooms · (3)b1 | 1076 |
| 3 bedrooms · (3)b | 1076 |
| 3 bedrooms · (3)c1 | 1076 |
| 3 bedrooms · (3)c | 1076 |
| 4 bedrooms · (4)a1 | 1184 |
| 4 bedrooms · (4)a | 1184 |
| 4 bedrooms · (4)b1 | 1184 |
| 4 bedrooms · (4)b | 1184 |
| 4 bedrooms · (4)c1 | 1399 |
| 4 bedrooms · (4)c | 1399 |
29 complete plan sheets, including ground-floor PES and mirrored variants. Sizes shown in sq ft are rounded conversions of the brochure’s square-metre areas. These describe original layouts, not current available stock. Study or ancillary spaces are not counted as bedrooms.
Prices & viewing
Pricing on request. The interactive project page includes available floor plans and indicative average transacted PSF, based on recent recorded sales across all bedrooms. Confirm current prices, unit availability and viewing arrangements with us.
Explore Lentor Central Residences →Sources & information status
Project record checked: 14 September 2026. Dates and availability may change.
Developer brochure, complete plan sheets and original distribution reviewed; current availability and final unit specifications requested